Site visit details

Overview

Catchment Yarra River
Site Darebin Creek at Darebin Parklands, ford (dog crossing) U/S railway bridge. ME_YDA558
Date and Time Monday 20th November 2006 00:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N Nitrate mg/L pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 8 500 0.7 8.4 25 20.7 10
Weather Sunny
Last rainfall Last 7 days
Flow estimate Slow
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Air temperature was taken in the shade- daily temp was 36 degrees. Phosphate measurement very high- not sure if this is correct. (think it may be 0.07)

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au