Waterwatch Data Portal
GB_MLD005 First dam that receives the efluent from dairy.
30 April 1999
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | First dam that receives the efluent from dairy. GB_MLD005 |
Date and Time | Friday 30th April 1999 14:00pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|
Sample | 810 | 9.6 | 0.08 | 17.5 | 14.3 | 190 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Dam about 3/4 full and had been drained of water and some mud on the 13/3/99. Fairly murky with some slime at the Northern end. Just a few boatmen and backswimmers, some midge larva.some tiger beetle larvae and hundreds of beetle tiger larva moults. Some green filamentous algae on water couch on the edge of dam. Also motile green algae when water sample viewed under microscope.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au