Waterwatch Data Portal
GB_MLD005 First dam that receives the efluent from dairy.
31 May 1999
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | First dam that receives the efluent from dairy. GB_MLD005 |
Date and Time | Monday 31st May 1999 16:00pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|
Sample | 1030 | 8.5 | 0.92 | 16.5 | 15.2 | 200 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Dam about 3/4 full. pH strips used for the first time so pH may be lower than normal.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au