Site visit details

Overview

Catchment Goulburn River
Site Stormwater inlet into bioremediation basin - Gemmills Swamp GB_WGS001
Date and Time Monday 23rd November 2015 11:00am
Approved Approved

Notes

Physical Chemical Tests

Chem mg/L D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 16 1.3 123 205 6.3 0.31 22.1 2420 0.65 78
Weather sunny
Last rainfall 0
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
sunny, windy day water level very low azolla present COD reading 266? - did not enter in table as too extreme

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au