Site visit details

Overview

Catchment Goulburn River
Site Pearsons Creek on Longwood/Gobur Road u/s Creightons Creek GB_PEA010
Date and Time Sunday 11th January 2015 12:00pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm Nitrate-Nit mg/L N pH pH Units Rain mm Air ° C Water ° C Coli orgs/100mL P mg/L Turb FTU Turb NTU
Sample 270 15
Weather
Last rainfall During the last 24 hours 2
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Creightons Creek Fire Waterwatch data. Fire started by lightning on Mon 15th Dec.On Tuesday spread S up the valley,wind change late in the afternoon pushed the fire E and NE into Gooram.On 25th Dec flared in Blue Hills valley,spread restricted by helicopters and fire tankers. Notes: Rainfall in the first event (10/1) varied by 50% along the valley,less variation in the second event(13/1) Site CRE003 is S of the fire zone,PEA010 and CRE010 are within the fire zone,CRE011 is N of the fire zone. Data collected on 21/12 and 18/1 were normal waterwatch collection days,these served as controls,no rain,no run off ,standard NTUs. As expected, rain in the previous 12 hrs dramatically increased the turbidity,but after 24 hrs,almost back to normal.The samples collected on the 10/1 showed high turbidity with some discolouration,however very little actual fire sediment. Usually following a rain event Ec decreases due to the diluting effect of the rain.Here at 3 out of 4 sites the Ec significantly increased,then gradually decreased.The increase is due to the presence of unknown particles which conduct an electric current as Ec measures not just salt but any conducting particle.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au