Waterwatch Data Portal
EG_NRB090 Nicholson River Backwater - 500m upstream (at fence)
31 January 2015
Site visit details
Overview
Catchment | Nicholson River |
---|---|
Site | Nicholson River Backwater - 500m upstream (at fence) EG_NRB090 |
Date and Time | Saturday 31st January 2015 09:30am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Secchi m | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 137.9 | 16370 | 7.08 | 0.12 | 14 | 21.8 | 0 |
Weather | overcast |
---|---|
Last rainfall | During the last week 12 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 1.7 |
Stream width | |
Hazards | |
Litter/Pollutants |
windy cold
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au