Site visit details

Overview

Catchment Mallee
Site Dunnings Wetland (Bridge Site) MA_WDU750
Date and Time Saturday 6th December 2014 10:50am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Water ° C Turb NTU
Sample 1023 7.43 0.1 21.8 17
Weather cloudy
Last rainfall During the last week 8.2
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Stained brown
Stream depth
Stream width
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au