Site visit details

Overview

Catchment
Site Seabreeze Estate, inlet drain gate 2 CO_IND068
Date and Time Friday 19th September 2014 16:00pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 117 11 200 8.1 0.03 19 17 13
Weather sunny
Last rainfall During the last week 14
Flow estimate PERMANENT: wetlands and lakes
Water Appearance Scummy
Stream depth
Stream width
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au