Waterwatch Data Portal
NC_BUL120 Bullock Creek: Upper Spring Ck Landcare, B3
3 September 2014
Site visit details
Overview
Catchment | Loddon River |
---|---|
Site | Bullock Creek: Upper Spring Ck Landcare, B3 NC_BUL120 |
Date and Time | Wednesday 3rd September 2014 10:40am |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 1920 | 7.5 | 0.01 | 9.2 | 10.4 | 9 |
Weather | cloudy |
---|---|
Last rainfall | During the last week 8 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear,Other: water weed growth |
Stream depth | 0 - 50cm |
Stream width | >5m |
Hazards | rocks |
Litter/Pollutants | bottles,paper,plastic |
pH for BUL120 was read as 7.5 but the meter calibration was 0.1pH units high. Both the EC and pH are lodged as "not calibrated" as both standard solutions were out of date.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au