Site visit details

Overview

Catchment Loddon River
Site Bullock Creek: Upper Spring Ck Landcare, B3 NC_BUL120
Date and Time Wednesday 3rd September 2014 10:40am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample 1920 7.5 0.01 9.2 10.4 9
Weather cloudy
Last rainfall During the last week 8
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear,Other: water weed growth
Stream depth 0 - 50cm
Stream width >5m
Hazards rocks
Litter/Pollutants bottles,paper,plastic
pH for BUL120 was read as 7.5 but the meter calibration was 0.1pH units high. Both the EC and pH are lodged as "not calibrated" as both standard solutions were out of date.

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au