Site visit details

Overview

Catchment Goulburn River
Site Stormwater inlet into bioremediation basin - Gemmills Swamp GB_WGS001
Date and Time Monday 2nd June 2014 11:10am
Approved Approved

Notes

Physical Chemical Tests

Chem mg/L D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 34 44 4.3 1120 163 6.6 15.4 1986 0.28 50
Weather sunny
Last rainfall During the last week 32.4
Flow estimate PERMANENT: wetlands and lakes
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
reactive phosphorus omitted - total phosphorus results contradicted consistent rain over past few days frogs calling

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au