Waterwatch Data Portal
GB_WGS001 Stormwater inlet into bioremediation basin - Gemmills Swamp
24 March 2014
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Stormwater inlet into bioremediation basin - Gemmills Swamp GB_WGS001 |
Date and Time | Monday 24th March 2014 09:30am |
Approved | Approved |
Physical Chemical Tests
Chem mg/L | D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 27 | 80 | 7.4 | 8 | 164 | 6.2 | 17.2 | 1203 | 0.23 | 18 |
Weather | overcast |
---|---|
Last rainfall | |
Flow estimate | PERMANENT: wetlands and lakes |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
oily scum on top of water reactive phosphorus reading omitted due to variation with total phosphorus
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au