Site visit details

Overview

Catchment Loddon River
Site Bullock Creek: Upper Spring Ck Landcare, B3 NC_BUL120
Date and Time Friday 1st August 2014 10:30am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample 1590 0.02 8.5 9.2 9
Weather cloudy
Last rainfall During the last week 7.5
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 51cm - 99cm
Stream width >5m
Hazards rocks
Litter/Pollutants bottles,cans,paper
pH for BUL120 was read as 7.0 but the meter calibration was out by 0.1pH units.

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au