Waterwatch Data Portal
GB_UBL010 Upper Blackwood Ck at Cathedral Lane, Taggerty
19 January 2014
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Upper Blackwood Ck at Cathedral Lane, Taggerty GB_UBL010 |
Date and Time | Sunday 19th January 2014 12:55pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | Rain mm | Water ° C | Tota mg/L | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 56 | 0 | 19.8 | 48 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Other: Silty |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Medium flow, silty. Heat wave and storm 2 days before sampled. Note from KJH - checked and only 0.8 mm rainfall in last week at Acheron River rain station at Taggerty
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au