Site visit details

Overview

Catchment Goulburn River
Site Upper Blackwood Ck at Cathedral Lane, Taggerty GB_UBL010
Date and Time Sunday 19th January 2014 12:55pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units Rain mm Water ° C Tota mg/L P mg/L Turb NTU
Sample 56 0 19.8 48
Weather
Last rainfall
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Other: Silty
Stream depth
Stream width
Hazards
Litter/Pollutants
Medium flow, silty. Heat wave and storm 2 days before sampled. Note from KJH - checked and only 0.8 mm rainfall in last week at Acheron River rain station at Taggerty

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au