Site visit details

Overview

Catchment Bunyip River
Site Cannibal Creek at Garfield North Rd, Garfield North ME_ECN300
Date and Time Friday 20th June 2014 10:53am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 248 6.7 0.03 11.5 9 10
Weather cloudy
Last rainfall During the last week 11
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 0 - 50cm
Stream width >5m
Hazards
Litter/Pollutants packets
This monitoring was done about 2 weeks late. These results reflect the autumn period. Naomi Dart - Waterwatch Coordinator was present.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au