Site visit details

Overview

Catchment Mallee
Site Dunnings Wetland (Bridge Site) MA_WDU750
Date and Time Friday 30th May 2014 11:41am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Water ° C Turb NTU
Sample 1352 7.9 0.15 20.6 32
Weather cloudy
Last rainfall During the last week
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth
Stream width
Hazards
Litter/Pollutants
slightly less flow than last time. The level seems to be going up and down quite abit

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au