Site visit details

Overview

Catchment Goulburn River
Site Hughes Creek on Springs Road GB_HUG002
Date and Time Thursday 24th April 2014 08:31am
Approved Approved

Notes

Physical Chemical Tests

E coli orgs/100mL EC µS/cm Rain mm Air ° C Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 200 0 9 9.5 9
Weather overcast
Last rainfall More than a week ago
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards
Litter/Pollutants
E.coli sample bottle cracked and leaked, but was decanted to new sterile bottle. When analysing, 50 ml was used, and 50ml topped up with sterile water prior to digestion, with results being multiplied by 2, by David Hodgkins.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au