Site visit details

Overview

Catchment Mallee
Site Dunnings Wetland (Bridge Site) MA_WDU750
Date and Time Wednesday 2nd April 2014 17:40pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Water ° C Turb NTU
Sample 1162 8.1 0.02 25.6 28
Weather cloudy
Last rainfall More than a week ago
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth
Stream width
Hazards
Litter/Pollutants
There is hardly any flow in the ponds this month. The water is very still

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au