Site visit details

Overview

Catchment Broken River
Site Holland Creek Benalla-Tatong Rd (Samaria Rd) GB_HOL012
Date and Time Monday 29th July 2013 11:45am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units Rain mm Water ° C P mg/L Turb NTU
Sample 91 9.7 55 5.5 9.8 10.8 0.02 18
Weather
Last rainfall
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Low but fast flow

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au