Waterwatch Data Portal
GB_DRY025 Dry Creek at McKenzies Bridge, Hamilton Street, Broadford
26 February 2013
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Dry Creek at McKenzies Bridge, Hamilton Street, Broadford GB_DRY025 |
Date and Time | Tuesday 26th February 2013 18:05pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 250 | 28 | 22.5 | 0.14 | 110 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours 28 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Muddy,Milky,Other: dark grey colour |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Side streams were flowing into the creek downstream of Jeffrey's Land (DRY015) after 28mm in last 24h and 33mm 4 days ago. Colour unusual - usually clay coloured after rain, not dark grey.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au