Site visit details

Overview

Catchment Yarra River
Site Mt Waverley Wetlands, at the rocky embankment at the most westerly end of the wetland, nearest the spillway ME_YSC100
Date and Time Sunday 27th January 2013 09:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0 330 7.3 18.5 19 74
Weather overcast
Last rainfall During the last 24 hours 0.5
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Muddy
Stream depth
Stream width
Hazards
Litter/Pollutants
No water is flowing into or out of the pond, which is drying out, level is about 75 cm below treatment level.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au