Site visit details

Overview

Catchment
Site Seabreeze Estate, inlet drain gate 2 CO_IND068
Date and Time Saturday 29th September 2012 11:00am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 70 7.3 2400 6.5 0.045 14 13 32
Weather sunny
Last rainfall During the last 24 hours
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
No water flowing from drain.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au