Site visit details

Overview

Catchment Genoa River
Site Davis Creek - Pipeline (Watertrust) Road EG_DAV030
Date and Time Saturday 15th September 2012 11:26am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 7.25 308 5.64 0.09 17.1 12.4 12
Weather
Last rainfall During the last week 7
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Weather fine,cloudcover breakingup, windy. Estuary closed. Sample, edge sample taken, 20 cm. Colour, tannin, slight rust odour, flowing, no litter. Flowing from two points from the peat swamp, bush upstream.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au