Site visit details

Overview

Catchment Yarra River
Site Glen Iris Hedgley Dene Drain ME_YGL 100
Date and Time Saturday 11th August 2012 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 8 590 7.5 0.2 14 12.3 10
Weather cloudy
Last rainfall During the last 24 hours
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
Stream width Unknown
Hazards
Litter/Pollutants bottles,packets,waxed cardboard

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au