Waterwatch Data Portal
EG_DEV040 Devlins Creek - Below pumping station
20 August 2012
Site visit details
Overview
Catchment | Genoa River |
---|---|
Site | Devlins Creek - Below pumping station EG_DEV040 |
Date and Time | Monday 20th August 2012 14:02pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 7.6 | 339 | 6.9 | 0.23 | 13.7 | 12 | 24 |
Weather | |
---|---|
Last rainfall | During the last week 35.5 |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Weather fine,scattered cumulous cloud, light breeze. Estuary open,low tide. Edge sample taken, depth 19cm. Inflow from stormwater drains. Colour a light muddy brown, no odour or litter. Good flow.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au