Site visit details

Overview

Catchment
Site Seabreeze Estate, inlet drain gate 2 CO_IND068
Date and Time Monday 2nd July 2012 10:30am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 55 6 3200 7 0.015 10 10 25
Weather raining
Last rainfall During the last 24 hours 18
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au