Site visit details

Overview

Catchment Yarra River
Site Mt Waverley Wetlands at the rocky embankment at the most westerly end, nearest Blackburn Rd ME_YSC099
Date and Time Sunday 20th November 2011 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 190 6.4 16 32
Weather sunny
Last rainfall During the last 24 hours 20
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
There was substantial rain in the previous few days and the streams and ponds have been refreshed. The Fiander Arm returned two extraordinary results: Zero Phosphate (usually it is mid range) and a Very Good bug score (usually below mid range, but note that the in-stream vegetation has been improving).

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au