Site visit details

Overview

Catchment Goulburn River
Site Upper Blackwood Ck at Cathedral Lane, Taggerty GB_UBL010
Date and Time Monday 21st December 2015 17:20pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units Rain mm Water ° C Tota mg/L P mg/L Turb NTU
Sample 3.2
Weather
Last rainfall
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

Empty - silt.

 

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au