Site visit details

Overview

Catchment Bunyip River
Site Main Creek at the Noxon property ME_EMI100
Date and Time Friday 28th August 2015 08:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 55.6 6 986 7.5 0.02 10.1 11.8
Weather cloudy
Last rainfall During the last 24 hours 4.00
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Clear
Stream depth Other:0 - 50 cm
Stream width Other:2 m
Hazards
Litter/Pollutants

Turbidity: < 10 

Dissolved O %: 0.6

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au