Site visit details

Overview

Catchment Yarra River
Site Karingal Creek, crn Susan and Brougham St, Eltham ME_YDI847
Date and Time Monday 15th June 2020 14:00pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 75.17 8 410 7.4 0.05 18.6 12.5 21
Weather sunny
Last rainfall During the last week 8.40
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Oily
Stream depth Other:25cm
Stream width Other:4 metres
Hazards
Litter/Pollutants paper,plastic,other: bits of wood

Quite a lot of rubbish … bits of wood, plastic, cardboard, etc
Ammonium and Phosphate levels were low.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au