Site visit details

Overview

Catchment Barwon River
Site Wetland at end of Pakington st, Newtown CO_PAK001
Date and Time Tuesday 17th September 2013 14:00pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 56.54 5.7 80 7 0.15 16 15 15
Weather overcast
Last rainfall During the last week 20.00
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width
Hazards
Litter/Pollutants bottles,plastic,polystyrene

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au