Site visit details

Overview

Catchment Yarra River
Site Westgate Park- Saltwater Lake (near Todd Road), Port Melbourne ME_YWP001
Date and Time Sunday 16th June 2013 09:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 72.99 8 5800 8.7 0.03 12.8 10.4 60
Weather sunny
Last rainfall During the last week 22.00
Flow estimate
Water Appearance Stained brown
Stream depth
Stream width
Hazards
Litter/Pollutants

Dramatic change in colour from last test. 81mm of rain so far for june. Water level rising.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au