Site visit details

Overview

Catchment Loddon River
Site Bullock Creek: Upper Spring Ck Landcare, B3 NC_BUL120
Date and Time Saturday 3rd September 2016 10:00am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C P mg/L Turb NTU
Sample 1490 7.1 0.01 12.3 11.5 9
Weather sunny
Last rainfall During the last week 19.50
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Clear
Stream depth 0 - 50cm
Stream width > 5m
Hazards rocks
Litter/Pollutants bottles,paper

My pH meter was an ecoTestr pH2

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au