Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek at Stones Crossing ME_ETN600
Date and Time Sunday 22nd August 2010 11:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 6 2740 8.1 0.05 14 13.2 55
Weather sunny
Last rainfall During the last 24 hours
Flow estimate Rapid
Water Appearance Other: discoloured
Stream depth 51cm - 99cm
Stream width
Hazards
Litter/Pollutants packets,paper,plastic,other
What has changed since last time you monitored? Stormwater drain (in cement block) upstream of test site overflowed during storm event week before so water and rubbish flowed into creek and would affect site monitoring. All 4 springs running. What stands out about the site today? Flood debris, trees toppled into creek both above and below site. Other observations: Due to Jan Oliver feeling unwell, Site #1 at estuary was not tested today.Persons monitoring: C Rose and J Oliver

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au