Site visit details

Overview

Catchment Bunyip River
Site Balcombe Creek at Augusta St Bridge, Mt Martha ME_EBA900
Date and Time Tuesday 17th May 2011 09:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 9 1420 6.7 0.03 15 13 10
Weather cloudy
Last rainfall During the last week
Flow estimate Slow
Water Appearance Stained brown
Stream depth 1m - 2m
Stream width >5m
Hazards
Litter/Pollutants
changes since last time monitored: EC down, DO risen- fresh water flushing estuary due to recent heavy rain. water level up estuary entrance open rainfall since last reading 107.2mm Persons conducting tests: Chris Spencer, John Inchley

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au