Site visit details

Overview

Catchment Bunyip River
Site Balcombe Creek at the footbridge as it exits The Briar's Park, Mt Martha ME_EBA800
Date and Time Sunday 10th July 2011 09:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 7 1520 6.8 0.07 11 10 10
Weather cloudy
Last rainfall During the last 24 hours
Flow estimate Rapid
Water Appearance Other: discoloured
Stream depth 0 - 50cm
Stream width >5m
Hazards
Litter/Pollutants
persons conducting tests: Chris Spencer, John Inchley Nitrate: 10mg/L changes since last time: ph decreased Estuary entrance closed, waves washing over barwith high waves rainfall since last reading 44.2mm

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au