Waterwatch Data Portal
GB_CRE007 Creightons Creek between Ramages and Baronga Creeks
18 September 2011
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek between Ramages and Baronga Creeks GB_CRE007 |
Date and Time | Sunday 18th September 2011 12:00pm |
Approved | Approved |
Physical Chemical Tests
E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 130 | 7.1 | 19 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall: ~ 6 mm from 21-8-11 to 18-9-11 EC: increase at all sites except JIM010 Turbidity: small decrease at most sites, small increase at CRE014 and CRE022
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au