Site visit details

Overview

Catchment Barwon River
Site Pennyroyal Creek upstream of bridge on Birregurra - Deans Marsh Rd CO_PEN080
Date and Time Monday 4th July 2011 13:41pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C P mg/L Turb FTU Turb NTU
Sample 87 251 7.5 0.01 12 9.5 6
Weather windy
Last rainfall During the last week 1
Flow estimate Slow
Water Appearance Muddy
Stream depth
Stream width
Hazards
Litter/Pollutants

Habitat

Survey conducted by Gene. Facing South, upstream.
Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Fair 3 Good 8 Good 8 VeryPoor 1 Fair 6 Fair 26

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au