Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek upstream of Estuary (land side of Esplanade) ME_ETN900
Date and Time Sunday 25th July 2010 11:45am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 8 732 0.07 9 12 11.6 60
Weather Sunny
Last rainfall Last 24 hrs
Flow estimate Fast
Water Appearance
Stream depth 85.00
Stream width 2.50
Hazards
Litter/Pollutants
5ml rain no rubbish utrbidity and pH are higher than usual There are photos with the group.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au