Site visit details

Overview

Catchment Yarra River
Site Salt Creek at Macleod ME_YSA500
Date and Time Tuesday 19th June 2001 15:45pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample 9.2 0.08 8.2 11 12
Weather Not specified
Last rainfall More than a week ago
Flow estimate Not specified
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
No rain data available, more than a week ago entered as default phosphate value was multiplied by 0.326 to convert from mg PO4/L to mg P /L This will also been done for the data for 19/7/2001, but possibly should be done to other records in Anne Paul groups set from 2001. The other records weren't multipled by the 0.326 factor, because there was no indication on the record sheet that it was necessary. the person who completed the record sheet may have neglected to indicate whether the multiplication is necessary or not, due to ignorance or carelessness.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au