Waterwatch Data Portal
ME_YDA290 Darebin Creek at Greenhills Rd, Bundoora
9 November 2010
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Darebin Creek at Greenhills Rd, Bundoora ME_YDA290 |
Date and Time | Tuesday 9th November 2010 10:15am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 5.8 | 1640 | 7.7 | 19 | 16 | 7 |
Weather | Sunny |
---|---|
Last rainfall | Last 3 days |
Flow estimate | Normal base flow |
Water Appearance | |
Stream depth | 30.00 |
Stream width | 3.50 |
Hazards | |
Litter/Pollutants |
The water level was 16cm below my reference point, which is 5cm higher than when last measured. At Mill Park I have had only 1mm of rain in the last 3 days (9mm for the week).
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au