Waterwatch Data Portal
ME_ETN900 Tanti Creek upstream of Estuary (land side of Esplanade)
30 May 2009
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Tanti Creek upstream of Estuary (land side of Esplanade) ME_ETN900 |
Date and Time | Saturday 30th May 2009 10:40am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FAU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 8 | 4400 | 0.02 | 8.2 | 14 | 11.8 | 5 |
Weather | Sunny |
---|---|
Last rainfall | Last 3 days |
Flow estimate | Slow |
Water Appearance | |
Stream depth | 0.75 |
Stream width | 1.50 |
Hazards | |
Litter/Pollutants |
note: sand removed from bed, so rock base, bank rocks on south side of bank disturbed (high flows during 26th April 2009 and extreme tide then probably the cause) photos have been taken, kept by monitor.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au