Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek upstream of Estuary (land side of Esplanade) ME_ETN900
Date and Time Saturday 28th March 2009 10:15am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 8 5580 0 7.9 17 15.3 5
Weather Sunny
Last rainfall Last 3 days
Flow estimate Slow
Water Appearance
Stream depth 64.00
Stream width 1.50
Hazards
Litter/Pollutants
Less than 0.5mm rain. Photos taken. Vegetation and flood debris along banks. Lots of small fish visible; algal bloo, of early march (extensive around estuary) washed out in storms and with high tides; much of long green water weed present in Feb now gone.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au