Waterwatch Data Portal
ME_ETN900 Tanti Creek upstream of Estuary (land side of Esplanade)
28 March 2009
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Tanti Creek upstream of Estuary (land side of Esplanade) ME_ETN900 |
Date and Time | Saturday 28th March 2009 10:15am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FAU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 8 | 5580 | 0 | 7.9 | 17 | 15.3 | 5 |
Weather | Sunny |
---|---|
Last rainfall | Last 3 days |
Flow estimate | Slow |
Water Appearance | |
Stream depth | 64.00 |
Stream width | 1.50 |
Hazards | |
Litter/Pollutants |
Less than 0.5mm rain. Photos taken. Vegetation and flood debris along banks. Lots of small fish visible; algal bloo, of early march (extensive around estuary) washed out in storms and with high tides; much of long green water weed present in Feb now gone.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au