Site visit details

Overview

Catchment Yarra River
Site Wetland 1@ Banyule Creek headwaters, Simpson Barracks Watsonia ME_YBA006
Date and Time Saturday 2nd June 2007 09:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample 0 8 60 0 7.4 9 9.5 20
Weather Overcast
Last rainfall Last 24 hrs
Flow estimate Still
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Water levels at both wetlands much higher this month which contributed towards good chemical results. Apart from slight turbidity, the wetlands are in great shape with plenty of frogs calling. Bug activity present, but no samples taken this month. Will wait until spring.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au