Waterwatch Data Portal
ME_YPL690 Plenty River at Kalparrin Ave (at Ford Crossing) Greensborough
4 August 2006
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Plenty River at Kalparrin Ave (at Ford Crossing) Greensborough ME_YPL690 |
Date and Time | Friday 4th August 2006 09:30am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 8 | 630 | 7.5 | 10 | 9 | 200 |
Weather | Overcast |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | Not specified |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Ammonium and P were not measured because sample was too turbid.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au