Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek upstream of Estuary (land side of Esplanade) ME_ETN900
Date and Time Friday 27th June 2008 14:45pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 10 5200 0.01 0.1 7.9 15.1 14.4 8
Weather Cloudy
Last rainfall Last 3 days
Flow estimate Slow
Water Appearance
Stream depth 40.00
Stream width 1.50
Hazards
Litter/Pollutants
Water very murky, high sediment. 5mm rain. Floods in previous week cleared away litter, but sediment still high.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au