Site visit details

Overview

Catchment Bunyip River
Site Wadsley Drain Frankston Fwy South of pump ME_DWA100
Date and Time Saturday 1st April 2006 00:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample 8 4000 8.6 14.7 14.5 5
Weather Sunny
Last rainfall Last 3 days
Flow estimate Permanent
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
4.2mm rain. Sulfur smell in same location as March.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au