Site visit details

Overview

Catchment Yarra River
Site Diamond Creek, Railway Pde, Eltham ME_YDI810
Date and Time Saturday 26th April 2008 09:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.1 2 370 0.07 7.4 13 10 10
Weather Cloudy
Last rainfall Last 24 hrs
Flow estimate Not specified
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Only 0.3mm of rain, several weeks since last decent rainfall. Creek did not appear to be flowing.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au