Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek upstream of Estuary (land side of Esplanade) ME_ETN900
Date and Time Saturday 5th March 2011 09:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 10 2110 0 7.9 16.5 14.6 7
Weather Sunny
Last rainfall Last 24 hrs
Flow estimate None
Water Appearance
Stream depth 80.00
Stream width 2.00
Hazards
Litter/Pollutants
High water level but not moving, site overgrown with grasses. Continuation of leakage of iron visible on bank from creek and possibly soil dumped sediments. A few fish observed.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au