Site visit details

Overview

Catchment Yarra River
Site Glen Waverley Main Drain. Behind 5/6 Crosby Drive, Glen Waverley ME_YSC012
Date and Time Wednesday 21st March 2001 14:00pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 640 0.5 7.4 20 19
Weather n/s
Last rainfall More than a week ago
Flow estimate n/s
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Last rainfall not specified. ? Unusually high ammonium levels, degraded beyond the 0.5 ppm scale of the test kit, were measured in the Crosby arm (Glen Waverley Drain) above its confluence with the Fiander arm (Scotchmans Creek). The measurement was confirmed by a second sample taken from the same site in the afternoon.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au