Site visit details

Overview

Catchment Yarra River
Site Darebin Creek at Greenhills Rd, Bundoora ME_YDA290
Date and Time Tuesday 8th February 2011 09:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 5.7 350 7.1 18 18 50
Weather Cloudy
Last rainfall Last 3 days
Flow estimate Very fast
Water Appearance
Stream depth 50.00
Stream width 5.00
Hazards
Litter/Pollutants
Water level was well above my reference point, which is more than 15cm higher than when last measured. High water level (following weekend?s major rain event). Shadow sampling with Julia Vanderoord (Coordinator). At Mill Park I have had 11mm of rain in the last 3 days, but over 100mm in the last 7 days.

Diary photos

No diary entries recorded for this visit